Metro Purple Line Extension Project (Click for Project Website)
Project Civil Engineer with experience in Section 2 & 3 of Mega Design-Build Project.
Section 2:
Contract Management with Metro design team for implementation of design including, RFIs, submittals, change notices, requests for change, claim support, and document control. Third Party coordination with LA Department of Water and Power (LADWP), LA Bureau of Street Services (LABSS) LA Bureau of Street Lighting (LABSL), LA Department of Transportation (LADOT), and LA Bureau of Engineering (LABOE) for construction activities taking place within the contractor’s work area to facilitate coordination and avoid construction delays. Civil design issue lead, coordinating the resolution of construction and design hurdles related to the temporary and restoration phases of civil construction that impact the project and stakeholders. Multi-discipline conflict analysis for design and construction coordination including utility unknowns, third-party as-builts, and contractor relocations. Review and attendance of pre-construction reports and meetings for defining existing conditions within the project impact boundary and limits of construction impact for restoration.
Section 3:
Research and modeling of existing structures along tunnel alignment and station locations for entrance integration. Additional responsibilities included development of Project Definition Drawings for contract bid, CAD Management with implementation of file structure and implementation of Metro CADD standards, CAD software conversion from MicroStation to Civil 3D, drainage design drawings for Caltrans detention basin, finalizing of SEIS documents, and quantity take-off for large design models.
Project Information: www.metro.net/projects/westside/
Metro Purple Line Facebook: https://www.facebook.com/purplelineext/photos
The Source Articles: thesource.metro.net/2022/01/31/purple-line-tunneling-completed-between-century-city-and-wilshire-rodeo/
https://thesource.metro.net/2021/05/19/intersection-in-century-city-reopens
https://thesource.metro.net/2020/06/15/metro-completes-decking-for-planned-beverly-hills-subway-station
Section 2:
Contract Management with Metro design team for implementation of design including, RFIs, submittals, change notices, requests for change, claim support, and document control. Third Party coordination with LA Department of Water and Power (LADWP), LA Bureau of Street Services (LABSS) LA Bureau of Street Lighting (LABSL), LA Department of Transportation (LADOT), and LA Bureau of Engineering (LABOE) for construction activities taking place within the contractor’s work area to facilitate coordination and avoid construction delays. Civil design issue lead, coordinating the resolution of construction and design hurdles related to the temporary and restoration phases of civil construction that impact the project and stakeholders. Multi-discipline conflict analysis for design and construction coordination including utility unknowns, third-party as-builts, and contractor relocations. Review and attendance of pre-construction reports and meetings for defining existing conditions within the project impact boundary and limits of construction impact for restoration.
Section 3:
Research and modeling of existing structures along tunnel alignment and station locations for entrance integration. Additional responsibilities included development of Project Definition Drawings for contract bid, CAD Management with implementation of file structure and implementation of Metro CADD standards, CAD software conversion from MicroStation to Civil 3D, drainage design drawings for Caltrans detention basin, finalizing of SEIS documents, and quantity take-off for large design models.
Project Information: www.metro.net/projects/westside/
Metro Purple Line Facebook: https://www.facebook.com/purplelineext/photos
The Source Articles: thesource.metro.net/2022/01/31/purple-line-tunneling-completed-between-century-city-and-wilshire-rodeo/
https://thesource.metro.net/2021/05/19/intersection-in-century-city-reopens
https://thesource.metro.net/2020/06/15/metro-completes-decking-for-planned-beverly-hills-subway-station
Project Fact Sheets
Highway Projects
|
|
|
|
Traffic Signal Improvement Projects
|
|
Metro Regional Connector Site Visit
Website Portfolio
I-15 & Limonite Interchange Project Study (Click for Project Website)
|
|
Simplistic Extrusion
Aqueous Transmission
Japanese American House
Get In Touch
If interested in getting in touch, click on the link below.
|